The checklist.

Work in progress.

Updated

4 of 6tasks actually running
Task 01 · Highest priorityRunning

Make Shipping reliable

Investigate the exact current-order fields and complete behavior before editing.

  • ✓Read four physically picked item rows: each already has one plain current order association
  • ✓Confirm Shipping loading/rendering omits that current-order field
  • ✓Identify separate cancelled history on one item; keep it historical
  • Resolve field-based current shipping state without promoting old cancelled or shipped history
  • Agree complete behavior, implement and run adversarial checks

Current change: Investigation only; no code or production record changes yet.

Task 02Running

Test Shipping edge cases

Refine actual-predicate fixtures using the newly verified plain order references.

  • ✓Run 11 baseline cases: 8 pass and 3 expose existing behavior
  • Test current plain order/state separately from unrelated cancelled and shipped history
  • Run the agreed Shipping patch against the revised fixtures
  • Check regressions before release

Baseline: Diagnostic results, not a release pass. No app or live-data writes.

Task 03Running

Preview every item

Investigate full-corpus device previews without requiring visits to each tab.

  • ✓Find inventory fetch starts only when Items opens
  • ✓Find preview list uses the filtered tab and warming stops when Items is hidden
  • Coordinate full-inventory startup and view-independent local preview generation
  • Keep original upload preparation and PUT transfers ahead of preview work
  • Test route/tab independence and no upload contention

Current state: Source investigation; not fixed or deployed.

Task 04Running

Integrate review recovery

Recapture the complete build and verify the preview. Production remains unchanged.

  • ✓Fix retained reorder restoring a newer cloud photo removal
  • ✓Fix synthetic same-ID/revision changed-content clearing
  • ✓Pass 73 focused handler checks
  • Recapture build and inspect rendered preview
  • Check existing authentication for the fixed deployment command
  • Release only after integrated verification; then reconcile device edits before local-storage removal
Task 05Available

Ready for the next task

Rule update and canonical-command investigation completed.

  • ✓AGENTS v12 capacity rule saved and verified
  • ✓Confirm a fixed Pages deployment command is supported
  • Authentication remains with recovery integration, not a second running task
Completed verification →
Task 06Available

Ready for the next task

Checklist updated to the current assignments.

  • ✓Check actual executing work with task owners
  • ✓Keep saved photo changes in Completed
  • ✓Retain exact pending proposals below
Saved changes and verification →
Pending photo decisions · awaiting coordinator review

These are unsaved Photos-only proposals, separate from the six active task slots.

Already saved: six unique SKUs, ten listing references removed across seven saves. Full per-SKU changes and preservation checks are on Completed.